top of page
Search
Writer's pictureShefali Emmanuel

HW8: Chapter 2

Updated: Oct 6, 2019

Ex 2.1

Q: Suggest the most appropriate generic software process model that might be used as a bias for managing the development of the following systems. Explain your answer according to the type of system being developed:


The waterfall model (software life cycle)- plan driven process (plan and schedule eall of the processes before starting the software development)


Incremental Development- get feedback and evolve software (not critical)


Prototyping- try out design options and find out more about the problem


A system to control antilock braking in a car.


A: The waterfall model (software life cycle)- plan driven process (plan and schedule eall of the processes before starting the software development)


A virtual reality system to support software maintainanace

A: Incremental Development- get feedback and evolve software (not critical)


A university accounting system that replaces an existing system

A: The waterfall model (software life cycle)- plan driven process (plan and schedule eall of the processes before starting the software development)


An interactive travel planning system that helps users plan journeys with the lowest environmental impact.

A: Prototyping- try out design options and find out more about the problem


Collaborated with Chandler Long

6 views0 comments

Recent Posts

See All

HW23: Chapter 22

Ex 22.6 Q: Fixed-price contracts, where the contractor bids a fixed price to complete system development, may be used to move project...

HW27: Chapter 25

Ex 25.10 Q: Describe 5 factors that engineers should take into account doing the process of building a release of a large software...

Comentários


bottom of page